In 2011, we began supporting the construction of the Summer Station PKP in Poznań. Our tasks included:

  • Inventory of the existing conditions - measuring existing platforms, buildings, and tracks,

  • Comparing project assumptions with the results of the inventory,

  • Establishing a control network,

  • Marking out the constructed platforms and other elements,

  • Post-execution and control inventory.

The biggest challenge was the very tight tolerance for error in positioning the heavy concrete elements of the platform, especially the platform slabs. Thanks to the use of the Trimble S3 Autolock 2" instrument, the work proceeded smoothly and with the required accuracy.


 

 