In January 2009, we began collaboration with Iberdrola Engineering and Construction Poland sp. z o.o. Our activities started with the vectorization of analog maps for design purposes, which were used to create the executive project. To develop a three-dimensional model of the terrain, we supplemented the map content with new elevation measurements within the scope of the assignment.

The wind farm consists of 50 wind turbines spread over an area of approximately 750 hectares. The geodetic support included the layout of the entire infrastructure of the wind farm: 50 foundations, 50 assembly sites, roads on the farm (approximately 35 km), cable routes (approximately 30-32 km), and leveling of anchoring rings.

After submitting the work to PODGiK in Chodzież, we located about 30 horizontal and vertical reference points. Based on the found points, we established the GPS location for the 1965 coordinate system. Before starting the layout of roads and platforms, we located a significant number of boundary markers to verify the coordinates of the boundary points obtained from PODGiK in Chodzież.

CONTACT

We encourage you to send an inquiry, and we will prepare a personalized offer for you.

This site uses cookies (cookies) that can work our service Better.