DESIGNED EARTHWORKS BALANCE
The task was to calculate the balance of planned earthworks for a designed section of a regional road near the area of Września, located near Poznań. Initially, we input the design data of the route into CAD software, creating a 3D model of the target road. Next, we conducted photogrammetric flights using the Trimble UX5 system, which allowed us to obtain a dense point cloud that formed the Digital Terrain Model (DTM). After cleaning the point cloud and supplementing the data with GPS RTN measurements, the terrain model was generated. The next step involved calculating the volumes of earthworks between the previously prepared models. Additionally, we precisely calculated the volume of the pile of loose material located near the planned construction site.
Services in the field Skanning 3D - offer
CONSTRUCTION AND ARCHITECTURAL INVENTORIES
Reverse documentation based on laser scanning data
VOLUME OF PRISMS UNDER ROOFS AND IN HALLS
Inventory of loose materials in warehouses under the roof and in the halls.
DIGITAL TERRAIN MODEL
3D terrain modeling based on point clouds from laser scanning and photogrammetry.
BUILDING AREA MEASURMENT
Measurement of the usable area of buildings in accordance with applicable standards.
BALANCE OF EARTH WORKS
Calculation of the amount of earthworks actually performed
INVENTORY OF DAMAGES AND MONITORING CHANGES
Precise measurement of damage after collisions and accidents
CONTACT
We encourage you to send an inquiry, and we will prepare a personalized offer for you.